ASUS ESC N8-E11 10SFF
- Condition
- New
- Manufacturer
- ASUS
- Form factor
- 7U
- CPU
- 2x Intel Xeon Platinum 8558Y+ (48C 300M Cache 2.30 GHz)
- RAM
- 32x 64Gb 5600MT/s RDIMM DDR5 (Support up to 32DDR5 4+8 TB)
- Power supply unit
- 6x 3000W Titanium
- HDD
- 2x 960Gb SSD/ 4x 3.84T SSD (up to 8xNVMe, 2xNVMe/ SATA 2.5'' SFF)
- NIC card
- 8x LAN CARD PSI-e G5 1P NDR/ 1x LAN CARD PSI-e G5 2P NDR200
- GPU
- 1 x 8-B200 HGX Baseboard
- Accelerator model
- NVIDIA B200 (HGX B200)
- Installed GPU count
- 8
- Maximum GPU count
- 8
- Memory per GPU
- 180GB HBM3e
- Total GPU memory
- 1440GB
- GPU memory bandwidth
- 8000 GB/s (8.0 TB/s) per GPU
- GPU form factor
- SXM
- GPU interconnect
- Fifth-generation NVIDIA NVLink with NVSwitch
- GPU-to-CPU interface
- PCIe 5.0 through the HGX baseboard fabric
- Supported compute data types
- FP64, FP32, TF32, BF16, FP16, FP8, FP6, FP4, INT8
- GPU virtualization
- NVIDIA vGPU, SR-IOV, GPU passthrough
- MIG support
- Up to 7 isolated GPU instances per GPU
- Software ecosystem
- NVIDIA CUDA, NVIDIA AI Enterprise and NVIDIA Transformer Engine
- Cooling
- Air cooling; passive accelerator modules with dedicated chassis airflow and hot-swap fan modules
- Recommended workloads
- Large-model AI training and inference, AI reasoning, LLM and multimodal workloads, HPC, simulation and data analytics
- Dimensions
- 435.95 x 447 x 885 mm (H x W x D)
- Weight
- 121 kg
Need a technical consultation on choosing a server?
Submit a requestASUS ESC N8-E11 10SFF is a high-density 10U enterprise GPU server storage configuration with ten front-accessible 2.5-inch SFF hot-swap drive bays. It is designed for AI factories, research centers, cloud providers, and enterprise data centers that need fast local storage for large-scale AI training, inference, and HPC workloads.
Key features:
-
Storage basket and service access: The configuration provides ten 2.5-inch hot-swap positions: eight NVMe bays and two rear bays supporting NVMe or SATA. Front-accessible hot-swap serviceability helps reduce planned maintenance time.
-
Installed accelerator subsystem: The installed accelerator subsystem contains 8 (1 x 8-GPU HGX baseboard) NVIDIA B200 SXM (HGX B200) accelerators with 1,440GB (8 x 180GB) of aggregate GPU memory. The configuration is sized for sustained enterprise workloads rather than a general-purpose display role.
-
High-bandwidth data path: The GPU fabric uses Fifth-generation NVIDIA NVLink with NVSwitch; 1.8 TB/s per GPU. Storage, GPU and network paths are arranged to support high-throughput data movement and minimize avoidable I/O bottlenecks.
-
Enterprise compute platform: The compute subsystem is configured as follows: CPU: 2 x Intel Xeon Platinum 8558Y+; memory: 2,048GB DDR5; slots: 32 DDR5 DIMM. This provides CPU, memory and PCIe resources for feeding the accelerator complex and hosting production services.
-
Management and availability: ASUS ASMB11-iKVM, ASUS Control Center and 5+1 x 3000W 80 PLUS Titanium redundant power supplies support remote administration, planned component replacement and resilient operation in the data center.
Use cases:
-
AI model training and fine-tuning: Uses the installed NVIDIA B200 SXM (HGX B200) subsystem for deep learning, generative AI and large-model development.
-
Inference and production AI services: Provides GPU memory and parallel compute for LLM, multimodal and enterprise inference workloads.
-
HPC, simulation and analytics: Accelerates scientific computing, numerical simulation, data science and other parallel workloads supported by the NVIDIA B200 SXM (HGX B200).
-
Data-intensive pipelines: Combines 10-bay 2.5-inch hot-swap storage with high-bandwidth GPU and network paths for datasets, checkpoints, staging and local scratch storage.
ASUS ESC N8-E11 10SFF is a purpose-built 10U GPU platform for organizations that need 10-bay 2.5-inch hot-swap storage, 1,440GB (8 x 180GB) of installed GPU memory and enterprise-class management in one deployable system.
to Buy a Server
from Servermall
warranty
testing
We want to make sure that our equipment is fully reliable for you. That’s why all our equipment (even new) is subject to complete diagnostics, testing, and part replacement.
testing
We fully load our equipment with various utilities and software. Rest assured, it’ll work for a very long time.
Power supply
The components work at full capacity and are tested for several days. If we are not sure about something, we replace it.
of all equipment
Our regulations imply the same testing for both used and new equipment. Oh, and by the way, we complement the official manufacturer’s warranty with our own warranty.